Scrappy Project Fabric Requirements

rated by 0 users
This post has 264 Replies | 43 Followers

Top 150 Contributor
Female
Posts 417
Points 10,440
Donna replied on Thu, May 31 2012 9:08 PM

I guess I better get into the sewing room and finish cutting my 2 1/2 squares so I will be ready.  LOL

  • Post Points: 5
Top 150 Contributor
Female
Posts 417
Points 10,440
Donna replied on Thu, May 31 2012 10:39 PM

I have finished the "darks" in my case they are fl orals,  also have the 6 1/2 done.  Now all I have left are the 2 1/2 background.  Taking a break thought.  After cooking at work for 8 hours then coming home and cooking turkey and dressing, etc,  my feet are a little tired lol. 

  • Post Points: 5
Top 150 Contributor
Female
Posts 417
Points 10,440
Donna replied on Thu, May 31 2012 10:39 PM

Oh and I forgot to ask.  Will the steps for the quilt be posted here?

  • Post Points: 20
Top 200 Contributor
Female
Posts 294
Points 3,235

Already behind on this one.  Was out of town nearly all week and haven't even begun to cut anything out yet.  Sure I'll be able to catch up eventually .. lol

  • Post Points: 35
Top 10 Contributor
Female
Posts 27,659
Points 435,535
Nana replied on Sun, Jun 3 2012 10:32 PM

Elizabeth

It shouldn't take you long to catch up.  Just enjoy the process.

Vinton, Virginia

  • Post Points: 5
Top 10 Contributor
Female
Posts 19,760
Points 247,454
Barbara replied on Sun, Jun 3 2012 10:34 PM

Elizabeth I just got mine cut today so you are not the only one running alittle slow,don't worry about it you have till Friday, , just enjoy it ,, Barbara

Liberty,Missouri

EAT!! SLEEP !! QUILT!!

  • Post Points: 20
Top 150 Contributor
Female
Posts 610
Points 9,025

I haven't even looked at my stash yet.  Maybe I'll use my green fabric from the FQ swap.  Still on MQ6.  Since this is only June 5th, can we not talk about the July project just yet?  I keep getting all the e-mails and it's confusing me.  I'm sure I'm not the only one.  I know most of you have more than one project going, and I should too.  But I can only handle one at a time from each group.  Slow down ladies (and gentlemen) and enjoy.  Rush rush rush, Hurry hurry hurry.  Don't y'all have a UFO or something you can work on? Just mho. 

  • Post Points: 20
Top 10 Contributor
Female
Posts 27,659
Points 435,535
Nana replied on Tue, Jun 5 2012 2:39 PM

MaggieNae

I am sorry that you are finding the 2 discussions confusing.   I always put the requirements for the next project up way in advance so that everyone has time to get their scraps together and cut if need be before the actual project begins.    I did the same thing with the June project.

Vinton, Virginia

  • Post Points: 20
Top 75 Contributor
Female
Posts 1,150
Points 15,750
Erin replied on Tue, Jun 5 2012 3:13 PM

You can also turn off email notifications for certain discussions.  I was getting a bunch of emails too!

Piece, Love, Quilt

  • Post Points: 5
Top 10 Contributor
Female
Posts 27,659
Points 435,535
Nana replied on Fri, Jan 25 2013 10:19 PM

bump

Vinton, Virginia

  • Post Points: 5
Page 18 of 18 (265 items) «Prev1415161718
| RSS
Have a Question? | About Us | Privacy Policy | Join Today Copyright ©2009-2014, Crafts Media, LLC ALL Rights Reserved.
By using this site, you agree to our Terms of Use