Temporary quilting quarters
The remodel is a slow thing. I am down to the studs. I have some framing to do and then I can start putting up the sheet rock.
For now, I have moved into the trailer in the driveway. I have set up quilt camp in our 1963 camp trailer. It is a tight fit, but it will do.
here are some pics for you to see.
THE RELIC

THE CUTTING AND PRESSING AREA

THE SEWING AREA
